Berel
Get started
Ocean

CY Cutoff

The last moment a loaded container can be delivered to the terminal and still make its vessel.

What is CY Cutoff?

The CY cutoff is the latest date and time by which a loaded export container must be gated in at the container yard or terminal to be loaded on a specific vessel. Carriers and terminals set it per voyage relative to the vessel's scheduled departure, and communicate it with the booking alongside other deadlines: documentation or shipping instruction cutoff, VGM cutoff, dangerous goods and reefer cutoffs, and the earliest receiving date. It is a commercial operating deadline rather than a legal one, but it sits alongside regulatory deadlines: under SOLAS chapter VI regulation 2, in force since 1 July 2016, a packed container must not be loaded without a verified gross mass. For US-bound cargo, the advance cargo declaration and the Importer Security Filing are both due 24 hours before loading at the foreign port. Port congestion, schedule changes and blank sailings can move cutoffs at short notice.

Why it matters for forwarders

Missing the CY cutoff usually means the container is rolled to the next sailing, with knock-on costs: additional terminal storage, more detention days on the equipment, missed transshipment connections and late delivery penalties under the customer's contract. Documentation and VGM cutoffs often fall earlier than the CY cutoff, so a container that gates in on time can still be shut out if the shipping instructions or VGM were late. Plan trucking backward from the earliest of all cutoffs, allowing for gate queues and terminal appointment systems, and reconfirm cutoffs after every schedule change. Keep evidence of the gate-in time, such as the equipment interchange receipt or terminal event, to settle disputes about rolled cargo and storage charges.

CY Cutoff FAQ

What happens if I miss the CY cutoff?

The container is normally rolled to the next available sailing. You may face extra storage and detention, and the new departure can break onward connections and delivery commitments.

What is the difference between CY cutoff and documentation cutoff?

The CY cutoff is the deadline for the physical container to reach the terminal. The documentation or SI cutoff is the deadline for shipping instructions needed to issue the bill of lading and file manifests, and it often falls earlier.

Who sets the CY cutoff?

The ocean carrier and the terminal set it for each vessel call based on the schedule and terminal operations. It is shown on the booking confirmation and can change when the vessel schedule changes.

What is the VGM cutoff?

It is the carrier's deadline for receiving the container's verified gross mass, required under SOLAS since 1 July 2016. A container without a VGM must not be loaded, even if it gated in before the CY cutoff.

Sources

  1. SOLAS: Verified Gross Mass, World Shipping Council
  2. 19 CFR 4.7: Inward foreign manifest; advance filing of cargo declaration, Legal Information Institute, Cornell Law School
  3. 19 CFR 149.2: Importer security filing, Legal Information Institute, Cornell Law School

Rules and figures change. Check the current text with the issuing body before relying on it.

Let agents handle the paperwork behind these words.

Berel drafts house bills, checks invoices and tracks every milestone, with your team in control.